Client:

Military Sealift Command, Marine Design & Operations
Location – San Diego, California

Our Role:

Piping design and refit, electrical design and refit, equipment foundation design.

Overview:

Being the first in its class, the USNS Montford Point underwent several system modifications post construction. The modifications enhanced the ability of the vessel to carry out its intended missions as an Expeditionary Transfer Dock ship. MDS played a role in several of these modifications, generating piping, electrical and structural drawings for the refit of this ship.